TERUMO VIETNAM FACTORY
Scope of work: Fabrication Piping/Mechnical erection work Period: 2020.05-2020.12 Location: Quang Minh IP – Me Linh – Hanoi
Scope of work: Fabrication Piping/Mechnical erection work Period: 2020.05-2020.12 Location: Quang Minh IP – Me Linh – Hanoi
Project: Hoa Phat/ Thang long Steel Period: 2017.01~2017.09 Scope of work: Supply material, Fabrication/ Installation/ Commissioning Location: IZ Thang Long/ Hung yen
Scope of work: Fabrication Piping/Mechnical erection work and Installation E&I work Period: 2010-2011 Location: Binh phươc Province
Client: Hyundai EC/PV Engineering Period: 2009-2010 Scope of work: Fabrication Piping/Mechnical erection work Location: Dung Quat, Quang ngai